Start a project
Oak kitchen with matching wood-grain splashback and a copper double sink, real ARIA project
← All services

Kitchen renovation in DubaiThe kitchen is your
second living room.

It is where the day starts and where people gather in the evening. It is also the room buyers and tenants look at first. A well-built kitchen raises how the whole home feels, and what it is worth.

Kitchen Renovation

Value it like the room it is

A kitchen brings together water, drainage, gas or high-load power, extraction, heavy joinery and stone in one small room. If one of these is wrong, the whole room is affected: a leaking trap under a new cabinet, an overloaded circuit behind the oven, an extractor that pushes grease into the ceiling void.

We plan the kitchen from the services outward, not from the cabinet catalogue inward. The layout, the plumbing points, the power and the ventilation are fixed first, and only then do the cabinets and the stone go in.

From site · AI transformation film ending on a real ARIA handover photo
Scope

What we do.

  1. 01Layout design and open-plan conversion, including wall removal with approvals
  2. 02New cabinets, islands, tall units and joinery to measure
  3. 03Stone, quartz and granite worktops and splashbacks
  4. 04Plumbing and drainage relocation, tested before the cabinets are fitted
  5. 05Dedicated power circuits for appliances, under-cabinet and feature lighting
  6. 06Extraction and ventilation ducted correctly to the outside
From our sites · Real ARIA photos

Not a render.
Our work.

Drag to compare · Real ARIA handover
Oak kitchen wall at handover with full-height cabinets, worktop and undermount sink. Real ARIA project.Kitchen Renovation before the works: bare shell. AI visualisation.BeforeAfter
What goes wrong elsewhere

The mistakes
we don’t make.

Cabinets fitted before testing

A hidden leak is found only when the new base units swell. We pressure-test first.

Appliances on shared circuits

Oven, hob and dishwasher on one line. Breakers trip, and cables run hot inside the wall.

Recirculating instead of extracting

Grease and humidity stay in the home and settle on the new joinery.

A cheap contractor’s saving shows up on the day you sign. The mistakes it causes can show up for years.

How ARIA runs it

Everything in writing.

Projects · Real ARIA work

Recent projects.

All projects
Questions

Kitchen Renovation in Dubai: FAQs.

How long does a kitchen renovation take in Dubai?

It depends on the scope and on the lead time for joinery and stone. After the site visit we give you a written programme with dates.

Can you move the sink or open the kitchen to the living room?

Yes. We relocate plumbing, drainage and power, and remove walls with the required approvals. Every new line is pressure-tested before the cabinets go in.

Why does a kitchen renovation need MEP work?

A kitchen combines water, drainage, high-load power and extraction in one room. We fix those first so the new kitchen does not leak, trip or trap grease in the ceiling.

Tell us a little bit
about your project.

Send the drawings, the address or just the idea. Within 48 hours you have a site visit booked, and after the visit you get a written scope and a price you can hold us to.

Tell us about your project
Tell us about your project